• Megatro 230kv BS-24 Single Circuit Angle Suspension Pioe (0-20 DEGREES)
  • Megatro 230kv BS-24 Single Circuit Angle Suspension Pioe (0-20 DEGREES)
  • Megatro 230kv BS-24 Single Circuit Angle Suspension Pioe (0-20 DEGREES)
  • Megatro 230kv BS-24 Single Circuit Angle Suspension Pioe (0-20 DEGREES)
  • Megatro 230kv BS-24 Single Circuit Angle Suspension Pioe (0-20 DEGREES)

Megatro 230kv BS-24 Single Circuit Angle Suspension Pioe (0-20 DEGREES)

Usage: Tension Tower, Angle Tower, Terminal Tower, Transposition Tower, Branching Tower, According to Client′s Technical Specification
Conductor Circuit: Single Circuit
Certification: ISO
Materials: Steel
Standard: Standard
Style: Independence Tower
Diamond Member Since 2010

Suppliers with verified business licenses

Manufacturer/Factory, Other

Basic Info.

Model NO.
MGP-230KV- BS-24
Structure
According to Client′s Technical Specification
We Can Design by Pls & Tower Software
According to Client Desing or Requirement
Transport Package
Export Standard Package
Specification
AS PER CLIENT
Trademark
MEGATRO
Origin
Shandong, China
HS Code
73082000
Production Capacity
40000 Tons/Year

Product Description

MEGATRO 230KV BS-24 SINGLE CIRCUIT ANGLE SUSPENSION PIOE(0-20 DEGREES)
Light angle transmission tower: 0~20 angle
And this photo is our 230KV BS-24 SINGLE CIRCUIT ANGLE SUSPENSION PIOE. On top of tower peak, we design only one single earth wire. This tower with technical specification as follow:
Project name  230kv transmission Line )
Voltage level 230kv Seismic intensity  
Main meteorological conditions Maximum design wind speed of M / sec.
Basic type Plate inclined Column Foundation ; The foundation is connected with the tower by inserting an angle connection.
Tower type 230kV :daxp\ dbxp\ dcxp\ ddxp\ ddexp\datr, total 283 base.
Wire type 230kV: ACSR/GA-1272MCM
Ground type 230kV: one uses the high strength-74.50 sq.mm, one uses the core OPGW-105 Optical cable.
       
       


Scope of work

the work scope of this project is XE Pian Xe Namnoy hydropower PROJECT Lao PDR package1:115kv/230kv Transmission Line ) corresponds to all the work.
The work undertaken in this project includes, but is not limited to:
2.2.1 , the construction of all materials, equipment procurement, transport and on behalf of the custody;
2.2.2 , all civil engineering, installation, acceptance and handover work;
2.2.3 , Line The clearing of road passages;
2.2.4 , the exclusion of the UXO(unexploded ordnance) within the line corridor and the corresponding safety and security work of the exploration design, management and construction personnel, provide UXO exclusion report.
2.2.5 , construction and transportation of temporary road, bridge and culvert laying;
2.2.6 , the requisition and compensation of the temporary land requisition required by the construction;
2.2.7 , commissioning and trial operation;
2.2.8 Skec issued PAC Pre-engineering line corridor and engineering body care and maintenance work;
2.2.9 , warranty period of warranty work;
2.2.10 , completion of data transfer work;



Megatro 230kv BS-24 Single Circuit Angle Suspension Pioe (0-20 DEGREES)
Over 10 years of experience and innovation in engineering, designing and building towers has evolved MEGATRO into its current form:
l        Full Turn-Key provider including site acquisition, engineering services, manufacturing,   field services-DAS, tech services, value added reseller and monitoring, maintenance and network ownership
l        Specialize in developing supplying and building wireless and wired networks and in-building telecommunications systems, as well as energy infrastructure
l        Single source from Design to System Integration
l        Top quality, ISO 9001 registered
A complete selection of towers including self-support, lattice steel tower, monopoles and guyed towers, form custom-designed radar towers to broadcast towers and energy infrastructure. MEGATRO carries a variety of related products including fall protection, transmission lines, antennas, obstruction lights, and accessories, and other products if client need, MEGATRO also tailored product as per client condition.
MEGATRO mainly design all kinds of towers and posts for:
a.      Telecoms
b.      Power transmission
c.      TV and Radio Broadcast
d.      Roads and City Development
e.      Wind energy solution
f.        Steel structure and workshop
 
Our complete selection of towers includes:
a.      Self-supporting
b.      Monopoles
c.      Guyed towers
d.      Custom-designed radar towers
e.      Broadcast towers
f.        Power transmission
 
MEGATRO also designs and manufactures tower related products including:
a.      Fall protection
b.      Antenna brackets
c.      Other accessories if needed by clients

Today, with over 10 years of experience and our commitment to excellence, MEGATRO remains an industry leader in the manufacture and design of steel tubular & angular & monopole structures for all Highway, Municipal, Custom, telecom, lighting and electric Utility applications. MEGATRO has a complete staff of professional engineering personnel trained in the PLS Pole program and three different manufacturing processes for producing steel towers, poles and other supports. We utilize the latest versions of PLS-CADD, PLS-POLE, TOWER, AutoCAD and other CAD software.
 
The structure shall be designed according to load combinations given as per IEC 61936-1 and as illustrated below:
Normal loads
1 Dead weight load
2 Tension load
3 Erection load
4 wind load
 
Exceptional loads
1 Switching forces
2 short-circuit forces
3 Loss of conductor tension
4 Earthquake forces


Moreover, MEGATRO is fully equipped and qualified to carry out Design Engineering services which includes:
√ Overhead Transmission line steel tower & Telecom steel tower
   Basic Design and Analysis
√ Shop Erection Drawings
√ As-Built Drawings
 
MEGATRO performs in-house design activities specializing in electrical overhead transmission &telecom tower steel works, which include wind and earthquake loading, static analysis, stress analysis by finite element methods and fatigue. Our Engineering Department is boasting of highly qualified engineering who are conversant with international codes and standards. The work is carried out with extensive use of CAE/CAD via a large of computer network. The computer hardware & drafting software are liked to the CNC workshop equipment for downloading of information thereby eliminating error and saving valuable production time.
 
Besides, MEGATRO is one of the few manufactures who assemble a face of   230KV BS-24 SINGLE CIRCUIT ANGLE SUSPENSION PIOE(0-20 DEGREES). This attention to quality may not be the cheapest process but it does insure every tower meets our high standards of quality. And it helps to reduce on-site construction cost due to mismatched assemblies. After fabrication all 230KV BS-24 SINGLE CIRCUIT ANGLE SUSPENSION PIOES(0-20 DEGREES) are delivered to the galvanizing facility to be Hot DIP Galvanized. Towers are processed through the facility by Caustic Cleaning, Pickling, and then Fluxing. These strict procedures insure years of maintenance free towers. All finished surfaces shall be level and free of tears, burrs, clots and impurities.
 
Except otherwise specified elsewhere in the specification, the surface treatment and corrosion protection for all metal parts shall be in conformity with the latest revision of the standards listed below:
ASTM A 123 zinc (hot-dipped galvanized) coating on iron and steel products
DIN 55928 Protective painting of steel structure instructions
DIN 55945 Painting materials-Notions
DIN 18363 Paint work-Buildings
DIN 18364 Surface protection work for steel
DIN 53210 Determination of rust degree
DIN 55151 Determination of adhesion
ISO4628/3 Determination of rust penetration
 
Our company will fully assume the contract stipulated within the scope of the project Construction organization coordination, project construction quality control, Project construction safety control, project construction schedule control, project construction cost control, project construction contract management, project construction information management, and achieve safe civilization construction, environmental protection objectives. At the same time, coordinate with project management of EPC and supervision engineer, carry out general contract and engineer's instruction to the project management. The main features are:

1 ). The project manager responsibility system, according to the company's legal person authorized, the project manager to fully perform the construction contract, and the entire project safety, quality, progress, civilized construction, environmental protection, cost to the company manager.
2 ). The project department is in line with functional project management organization settings.
3 ). The company appoints a deputy manager to coordinate the relevant functional departments of the company, responsible for providing professional guidance and logistic services to the construction project.
4 ). The project department specially set up external Affairs Department, responsible for external coordination work: green compensation, land requisition and so on.
5 ). Civilized construction is the important control content of this project, the project department specially sets up the safe civilized construction management task, is responsible for the safe civilized construction management work full-time.
6 ). The project manager and the construction team sign the safety guarantee responsibility, the construction captain and the construction team personnel sign the Safety guarantee Liability agreement, will the company internal safety management stipulation duty layer decomposition, implements to the person.
7 ). The implementation of standardized management, before the commencement of the establishment of a sound management system, clear responsibility, implementation of the person, the construction phase by the project department responsible for supervision and assessment.
8 ). Using project software to carry out the construction progress, the cost status dynamic control and the statistic report work, select through the specialized training study and the examination qualified personnel, as the specialized Project software operator, the software code according to the unification request.
9 ). With a sound information management system and equipment to ensure timely communication with the general contractor.
2.3.1.2 Management System
Establish and improve the project management organization, the implementation of our company in line with the relevant quality management system standard requirements of the "Quality Management manual" and the corresponding "Quality Management system procedure document"; Implementation of our company in line with the "environmental management system norms and use of guidelines", "Occupational Safety and health management system audit norms "Occupational health and Safety and Environmental Management Handbook", "Occupational Health and Safety (OHS) and environmental management system (EMS)" procedures, as required by the regulations on the safety and Health and environmental management of electric power construction.
2.3.1.3 Management Specification
Our company has begun to implement the "construction project management Norms", the project will be unified deployment of the implementation of the company. According to the actual situation of this project, the following points are emphasized:
N Project manager responsibility System
N Construction Technology Management responsibility system
N Construction Safety Management responsibility System
N Construction Quality Management responsibility system
N Project Management target responsibility
N Project costing system
The above 6 items will be PDCA circulation in this project. Project management requirements adhere to the times, continue to improve, and strive to make the project management of our company to improve the level of project management on the road another milestone.
2.3.1.4 Management Tools
N contract means: strictly implement the terms of the construction contract signed by the company to be honest and trustworthy; the internal management of the implementation of the project and the company's employees of the labor contract, clear responsibility, rights and benefits, the use of humanistic management of subcontracting, strengthen labor protection, to local compensation contracts, compliance with reputation, does not cause problems.
N economic means: The implementation of the Company's economic responsibility system, detailed work responsibilities, to achieve responsibility to people, people in place, measures to implement, take performance appraisal system, reward, and ensure the implementation in place.
N scientific means: Application Project the project management software compiles and adjusts the progress plan and the project resources. Using Project management software to carry out track record of completed construction progress, resource usage and related costs, using Project management software to the actual progress, resource consumption , cost and target comparison, analysis, evaluation of the implementation of the plan, combined with the next phase of planning, so as to achieve dynamic control of the project, scientific management, improve project management level.

2.3.2. General Requirements

2.3.2.1 The overall requirements for the construction management of the project:
A. to comprehensively complete the safety, quality, time limit, efficiency, civilized construction and environmental protection objectives required by the general contracting;
B. equipped with high-quality construction management personnel and construction personnel;
c. to formulate a comprehensive and rational planning;
d. the establishment of strong, efficient, adaptable, strong implementation of the organizational structure;
E. to improve the practical and effective management system;
F. have complete, true, neat construction record;
G. establish a timely, accurate and smooth information communication channels.
Finally achieved:
Serial number Administrative name General requirements
One Quality objectives Strictly implement the laws, regulations and rules and regulations and the main contract requirements for the quality management of engineering construction in China and Laos, and subject to the requirements of the main contract. Meet the quality requirements of the main contract.
Two Security objectives No personal death accidents occur, no major equipment, major construction machinery damage accidents, no major fire accidents, no major traffic accidents, no major environmental pollution accidents and major collapse (collapse) accidents, no large area of infectious diseases and collective accident poisoning. To eliminate the general safety accidents, do not occur in general and above equipment accidents, do not occur in general and above fire accidents.
Three Progress target adhere to the "Project progress compliance with safety, quality" as the principle, actively take appropriate measures to ensure that the project opening, completion time and project milestones progress plan on time completion. Commitment to the construction of the project in 2018 years ago completed.
Four Environmental objectives In the construction process strictly abide by the Laos state and local laws on environmental protection and the relevant provisions of the contract, and should be in violation of the provisions of the above-mentioned laws or contracts caused by environmental damage and personnel casualties and property losses bear full responsibility.
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now