Structure: | According to Client Design and Requirement |
---|---|
Shape: | According to Client Design and Requirement |
Standard: | According to Client Design and Requirement |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Tower type | MEGAYRO Three tube or tribular Telecom Tower |
Define | Three-tube tower refers to tower column is made of steel pipe, and the Tower body section is a three-side-shaped free-standing high-rise steel structure. |
Main Features | Tower column of three tube towers. The steel pipe is made, the section of the tower is three-side shape, it is a kind of tall steel structure different from the angle steel tower, the welding work is very heavy. |
Applicable wind pressure | ≤ 0.65 kn/M2 |
Applicable height | ≤50M |
Maintenance Platform | According to the antenna hanging high and antenna size, flexible adjustment platform spacing, increase the number of platforms or holding Poles. |
Disadvantages | Advantages: Compared with the traditional angle steel tower, the section of the tower is three-side shape, the number of components is reduced, the economy is good, the area is small, the structure is simple, the construction is convenient and the installation period is shortened significantly. Luck requirements for two times are low. Disadvantages: Three Tube tower stiffness Weaker Anti-twist Difference, not suitable for microwave tower, height should not be higher than 55m; the shape belongs to the ordinary tower, no landscape considerations. There are many components and many nodes, so it is more difficult to relocate and reuse. |
Applicable scenarios | 1)Three tube towers applyThe scene is wide, especially suitable for the small area of the proposed site, save the construction land. 2 Industrial Development zone, such as suburban areas, county, township, rural areas, such as low demand for landscape, easy to land expropriation areas. |
Construction period | 3-5-day installation of tower body: Type Foundation Construction: 30-40 days, prefabricated Foundation can shorten the time limit greatly. |
Base form | Depending on the geological situation, Three-tube towers can be the basic forms used are: Prefabricated assembling foundation, Independent Foundation,Foundation of Raft Board, Pile Cap Foundation and other basic forms. |
Cost | 11000-12500 per ton |
Steel material | tensile, bending and press strength (N/mm2) | shear strength (N/mm2) |
|
Grade | Thickness or diameter (mm) | ||
Q235 Steel |
≤16 | 215 | 125 |
>16~40 | 205 | 120 | |
>40~60 | 200 | 115 | |
>60~100 | 190 | 110 | |
Q345 Steel |
≤16 | 310 | 180 |
>16~35 | 295 | 170 | |
>35~50 | 265 | 155 | |
>50~100 | 250 | 145 | |
Q420 Steel |
≤16 | 380 | 220 |
>16~35 | 360 | 210 | |
>35~50 | 340 | 195 | |
>50~100 | 325 | 185 | |
Q460 Steel |
≤16 | 415 | 240 |
>16~35 | 395 | 230 | |
>35~50 | 380 | 220 | |
>50~100 | 360 | 210 |
Item | Grade | tensile strength (N/mm2) | Shear strength (N/mm2) |
Fastener for towers |
4.8 | 200 | 170 |
5.8 | 240 | 210 | |
6.8 | 300 | 240 | |
8.8 | 400 | 300 | |
Anchor bolts |
Q235 | 160 | / |
Chinese 35 steel | 190 | / | |
Chinese 45 steel | 215 | / |