Megatro PL16 line marching off powerlines
Megatro PL16 line marching off powerlines design combine steel building and tower together, design must consider the basic train requirements, and easily to install, to discharge and not restrict by condition or other requirements. Tower often painting after fabrication or other finish.
MEGATRO can design and produce every type of Fire control and training tower as per client requirements.
Other information:
Port of Loading: Qingdao Port
Lead Time: One month or based on the customer needs
Performance Standard: Besides conform to the drawing and design, the materials and fabrication of tower components shall conform to Chinese Standard or other international standard.
Payment: TT, LC
Delivery: 30 days against deposit or Negotiate
Origin: Shandong, China
Minimum Order: 1 ton
Packaging: Export standard package
Inspection: In house or their party inspection
Samples: Charge
Sample Price: US$1300