115kv Three Dead End Steel Pole and Switch Substation Framework (MGP-SP115)

Product Details
We Design by Pls& Tower Software: According to Client Requirements
Accessories 1: Power Fitting
Accessories 2: Insulator
Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 14001, OHSAS/ OHSMS 18001
Find Similar Products

Basic Info.

Model NO.
MGP-SP115
Accessories 3
Conductor and Cable
Accessories 4
Earth Wire and Opgw
Accessories 5
Tower Foundation and Anchor Bolt
Accessories 6
Tower Earthing Kits and Template
Accessories 7
Aviation Light
Accessories 8
Damper,
Accessories 9
Anti-Climbing Device
Accessories 10
Anti-Bird Device
Other Service 1
Installation Guide
Other Service 2
Engineering Consultant
Other Service 3
Project Budget
Transport Package
Export Standard Package
Specification
AS PER CLIENT
Trademark
MEGATRO
Origin
Shandong, China
HS Code
73082000
Production Capacity
45000 Tons/Year

Product Description

Megatro 115KV three dead end steel pole and switch substation framework
This photo refers to our 115KV  three dead end steel pole and switch substation framework. These three poles as dead end structure and being single circuit line, beside three poles are switch substation framework, which switch 115KV to 69KV transmission line again.
These 115KV three dead end poles are made of polygonal monopole, and often used in city power transmission grid, with little space, economic and lower cost. Now MEGATRO can produce distribution pole with some type as follow:
(1) Flange connection
(2) Slip joint
(3) Step type
(4) Stagger type
(5) Others
115kv Three Dead End Steel Pole and Switch Substation Framework (MGP-SP115)

For this 115/69KV substation framework, its features as follow:
This substation structures were made of angle steel, square pipe, channel steel or others, with features as follow: 
Custom designed to meet your dimensional requirements
Certified drawings & calculation package provided
Galvanized to ASTM A123
Design codes and specifications:
Industry: NESC, IEEE standard 605, and ASCE Manual 113
Wind: per 2009 IBC & ASCE/SEI7-05
Seismic: per 2006 IBC section 1613, ASCE 7-05 section 15.1.3 &12.8
Welding: ANSI/AWS D1.1-06

Since 2004, our MEGATRO begin to produce and design every type of steel pole and substation for our overseas clients. MEGATRO can optimize design, to set a compact, narrow base, the tower design not only advanced but practical, with an emphasis on economic rationality to ensure safe and reliable operation. Today, with over 10 years of experience and our commitment to excellence, MEGATRO remains an industry leader in the manufacture and design of steel tubular & monopole structures for all Highway, Municipal, Custom, telecom, lighting and electric Utility applications. MEGATRO has a complete staff of professional engineering personnel trained in the PLS Pole program and three different manufacturing processes for producing steel towers, poles and other supports. We utilize the latest versions of PLS-CADD, PLS-POLE, TOWER, AutoCAD and other CAD software.

MEGATRO is one of the few manufactures who assemble a face of 115KV three dead end poles. This attention to quality may not be the cheapest process but it does insure every tower meets our high standards of quality. And it helps to reduce on-site construction cost due to mismatched assemblies. MEGATRO 115KV three dead end poles systems can accommodate a variety of cross-arm and other accessories.
After fabrication 115KV three dead end poles and 115/69KV substation frameworks are delivered to the galvanizing facility to be Hot DIP Galvanized. Towers are processed through the facility by Caustic Cleaning, Pickling, and then Fluxing. These strict procedures insure years of maintenance free towers. Even we take secondary finish for client again, which as duplex surface treatment.  

Other information:
Availability size: Based on the customer's requirements.
Material: Chinese material or as per clients requirement
Package: Both parties discuss before delivery
Port of Loading: Qingdao Port
Lead Time: One month or based on the customer's needs
Minimum order: 1 set
Fabrication standard: Chinese Standard or other standard which client accepted

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier