Megatro 500kv Dead End a-Frame Substation Structure (MGP-500AF)

Product Details
We Can Design by Pls & Tower Software: as Per Client Design and Data
Transport Package: Export Stnadard Package
Specification: AS PER CLIENT
Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 14001, OHSAS/ OHSMS 18001
Find Similar Products

Basic Info.

Model NO.
MGP-500AF
Trademark
MEGATRO
Origin
Shandong, China
HS Code
73082000
Production Capacity
40000 Tons/Year

Product Description

Megatro 500KV dead end A-frame substation framework
MEGATRO provide design and fabrication of 500KV dead end A-frame substation framework for our overseas clients.
This bus structure was made of angle steel, square pipe, channel steel or others. Our 500KV A-frame dead end substation framework has features as follow:
Custom designed to meet your dimensional requirements
Certified drawings & calculation package provided
Galvanized to ASTM A123
Design codes and specifications:
Industry: NESC, IEEE standard 605, and ASCE Manual 113
Wind: Per 2009 IBC & ASCE/SEI7-05
Seismic: Per 2006 IBC section 1613, ASCE 7-05 section 15.1.3 &12.8
Welding: ANSI/AWS D1.1-06
In material, we adopt high strength steel such as ASTM A572 GR50, GR65, Q420, Q460, S355J0, S355J0, Fe510, ST52 or other equivalent steel to meet project requirements. MEGATRO can optimize design and make 500KV substation framework by solid, high strength, proper span distance, good wind resistance material, and economy in the use of materials.
After fabrication all 500KV A-frame dead end substation framework are delivered to the galvanizing facility to be Hot DIP Galvanized. All substation framework is processed through the facility by Caustic Cleaning, Pickling, and then Fluxing. These strict procedures insure years of maintenance free structures.
Megatro 500kv Dead End a-Frame Substation Structure (MGP-500AF)

Fabrication: Conform to clients' drawings and technical requirements
Place of Origin: Qingdao, Shandong, China.
Availability size: Based on the customer's requirements.
Material: Chinese material or as per clients' requirements
Package: Both party discusses and agreed before delivery
Terms of Payment: L/C; T/T
Minimum Order Quantity: 1 set
Port of Loading: Qingdao Port
Lead Time: One month or based on the customer's needs.

Performance Standard
Besides conform to the drawing and design, the materials and fabrication of tower components shall conform to Chinese Standards or international standard.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier