Megatro 115KV step-up switchyard structure
MEGATRO provide design and fabrication of 115KV step-up switchyard structure for our overseas clients.
115KV step-up switchyard structures were made of angle steel, square pipe, channel steel or others. Our 115KV step-up switchyard structures have features as follow:
Custom designed to meet your dimensional requirements
Certified drawings & calculation package provided
Galvanized to ASTM A123
Design codes and specifications:
Industry: NESC, IEEE standard 605, and ASCE Manual 113
Wind: Per 2009 IBC & ASCE/SEI7-05
Seismic: Per 2006 IBC section 1613, ASCE 7-05 section 15.1.3 &12.8
Welding: ANSI/AWS D1.1-06
In material, we adopt high strength steel such as ASTM A572 GR50, GR65, Q420, Q460, S355J0, S355J0, Fe510, ST52 or other equivalent steel to meet project requirements. MEGATRO can optimize design and make 115KV step-up switchyard structures by solid, high strength, proper span distance, good wind resistance material, and economy in the use of materials.
After fabrication all 115KV step-up switchyard structure, are delivered to the galvanizing facility to be Hot DIP Galvanized. 115KV step-up switchyard structures are processed through the facility by Caustic Cleaning, Pickling, and then Fluxing. These strict procedures insure years of maintenance free towers.
Fabrication: Conform to clients' drawings and technical requirements
Place of Origin: Qingdao, Shandong, China.
Availability size: Based on the customer's requirements.
Material: Chinese material or as per clients requirements
Package: Both party discuss and agreed before delivery
Terms of Payment: L/C; T/T
Minimum Order Quantity: 1 set
Port of Loading: Qingdao Port
Lead Time: One month or based on the customer's needs.
Performance Standard
Besides conform to the drawing and design, the materials and fabrication of tower components shall conform to Chinese Standards or international standard.