115kv-23kv Transformer Substation Steel Structure (MGS-TSS115)

Product Details
We Can Design: as Per Client Design and Data
Transport Package: Export Stnadard Package
Specification: AS PER CLIENT
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 14001, OHSAS/ OHSMS 18001
Find Similar Products

Basic Info.

Model NO.
MGS-TSS115
Trademark
MEGATRO
Origin
Shandong, China
HS Code
73082000
Production Capacity
50000 Tons/Year

Packaging & Delivery

Package Size
8900.00cm * 400.00cm * 400.00cm
Package Gross Weight
1600.000kg

Product Description

115KV-23KV transformer substation steel structure
MEGATRO provide design and fabrication of 115KV-23KV transformer substation steel structure for our overseas clients.
115KV-23KV transformer substation steel structure was made of angle steel, square pipe, channel steel or others. Our 115KV-23KV transformer substation steel structure has features as follow:
Custom designed to meet your dimensional requirements
Certified drawings & calculation package provided
Galvanized to ASTM A123
Design codes and specifications:
Industry: NESC, IEEE standard 605, and ASCE Manual 113
Wind: Per 2009 IBC & ASCE/SEI7-05
Seismic: Per 2006 IBC section 1613, ASCE 7-05 section 15.1.3 &12.8
Welding: ANSI/AWS D1.1-06
In material, we adopt high strength steel such as ASTM A572 GR50, GR65, Q420, Q460, S355J0, S355J0, Fe510, ST52 or other equivalent steel to meet project requirements. MEGATRO can optimize design and make 115KV-23KV transformer substation steel structure by solid, high strength, proper span distance, good wind resistance material, and economy in the use of materials.
After fabrication all 115KV-23KV transformer substation steel structure, are delivered to the galvanizing facility to be Hot DIP Galvanized. 115KV-23KV transformer substation steel structure is processed through the facility by Caustic Cleaning, Pickling, and then Fluxing. These strict procedures insure years of maintenance free structures.
115kv-23kv Transformer Substation Steel Structure (MGS-TSS115)

Fabrication: Conform to clients' drawings and technical requirements
Place of Origin: Qingdao, Shandong, China.
Availability size: Based on the customer's requirements.
Material: Chinese material or as per clients' requirements
Package: Both party discusses and agreed before delivery
Terms of Payment: L/C; T/T
Minimum Order Quantity: 1 set
Port of Loading: Qingdao Port
Lead Time: One month or based on the customer's needs.

Performance Standard
Besides conform to the drawing and design, the materials and fabrication of tower components shall conform to Chinese Standards or international standard.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now