Usage: Flying Angle Tower, Crossing Tower, Tension Tower, Angle Tower, Terminal Tower, Transposition Tower, Branching Tower, According to Client Requirements
Conductor Circuit: According to Client Requirements
Certification: ISO
Materials: Steel
Standard: Nonstandard
Style: According to Client Requirements
Diamond Member Since 2010

Suppliers with verified business licenses

Manufacturer/Factory, Other

Basic Info.

Model NO.
MG-TFT03
Structure
According to Client Requirements
We Can Design and Produce
According to Client Desing or Requirement
Transport Package
Export Stnadard Package
Specification
AS PER CLIENT
Trademark
MEGATRO
Origin
Shandong, China
HS Code
73082000
Production Capacity
50000 Tons/Year

Product Description

Being one of professional tower manufacturers, MEGATRO can provide a wide range of tower foot foundation to meet your needs for power transmission line steel tower, telecom tower, or other type towers. We fabricate every type of tower foot foundation to fit not only our towers, but also those of our competitors. All tower foot foundation are made from Chinese or international standard steel and welded by certified welders.

After fabrication all tower foot foundation are delivered to the galvanizing facility to be Hot DIP Galvanized. Tower foot foundations are processed through the facility by Caustic Cleaning, Pickling, and then Fluxing. These strict procedures insure years of maintenance free towers. MEGATRO tower foot foundation come in a variety of configurations to meet your specific needs.

Please contact us today to see what we can offer. We try to do every type tower foot foundation as per your drawings and other requirements.
Other information:
Availability size: Based on the customer's requirements.
Material: Chinese material or as per clients requirement
Package: Both parties discuss before delivery
Terms of Payment: L/C, T/T
Minimum Order Quantity: 1 tons
Port of Loading: Qingdao Port
Lead Time: One month or based on the customer's needs

Megatro Tower Foot Foundation (MG-TFT03)

Performance Standard
Besides conform to the drawing and design, the materials and fabrication of tower components shall conform to the Chinese Standard or other standard which clients can accept.
1. GB/T2694-2003 Transmission line tower - - Technical requirements for manufacturing
2. JGJ81-2002: Technical specification for welding for steel structure of building
3. GB9787-88: Measuring and allowable tolerance for hot-rolled equal angle
4. GB709-88: Measuring and allowable tolerance for hot-rolled plate and strip
5. GB/T699-1999: Quality Carbon Structural Steel
6. GB/T1591-1994: Low alloy high strength structural Steel
7. GB700-88: Carbon Structural Steel
8. GB222-84: Method of sampling steel for determination of chemical composition and permissible variations
9. GB/T228-2002: Method for Tensile testing of metals
10 GB/T232-1999: Method for Bending test of metals
11 GB/T5117-1995: Carbon Welding Rod
12 GB/T5118-1995: Low Alloy Welding Rod
13 GB/T8110-1995: Welding wires for gas shielding arc welding of carbon and low alloy steels
14 GB/T10045-2001: Carbon steel flux cored electrodes for arc welding
15 JB/T7949-1999: Weld outer dimensions for steel construction
16 GB50205-2001: Test Standard for Acceptance of Steel Structure
17 GB/T470-1997: Zinc Ingot
18 GB3098.1-2000: Mechanical properties of fasteners-Part 1: Bolts, screws and studs
19 GB3098.2-2000: Mechanical properties of fasteners-Part2: Nuts, and thread
20 GB3098.3-2000: Mechanical properties of fasteners-Part3: Fastening screw
21 GB/T5780-2000: Helical Bolts Grade C
22 GB/T41-2000: Helical Nuts Grade C
23 GB/T90-2002: Flat Washer Grade C
24 GB/T13912-2002: Metal Coating, Technical Requirement

Send your message to this supplier