Gold Member Since 2010
Audited Supplier
Qingdao Megatro Mechanical and Electrical Equipment Co., Ltd.

15kv-13.2kv Transformer Substation Framework, 15kv-13.2kv Transformer Substation Structure, 15kv-13.2kv Transformer Substation Mast manufacturer / supplier in China, offering 15kv-13.2kv Transformer Substation Framework (MGS-SF15), Tilt Tower /Telecom Tower/ Climate Measuring Tower (MGT-TT007), Area Lighting Pole/Street Light/Yard Light Pole (MGL-AL008) and so on.

(/ )

Supplier Homepage Product Substation products 15kv-13.2kv Transformer Substation Framework (MGS-SF15)

15kv-13.2kv Transformer Substation Framework (MGS-SF15)

FOB Price: US $1,120 / Ton
Min. Order: 1 Set
Min. Order FOB Price
1 Set US $1,120/ Ton
Get Latest Price
Production Capacity: 40000 Sets/Year
Transport Package: Export Stnadard Package
Payment Terms: L/C, T/T
Basic Info
  • Model NO.: MGS-SF15
  • Trademark: MEGATRO
  • Origin: Shandong, China
  • We Can Design: as Per Client Design and Data
  • Specification: AS PER CLIENT
  • HS Code: 73082000
Product Description
15KV-13.2KV transformer substation framework
MEGATRO provide design and fabrication of 15KV-13.2KV transformer substation framework for our overseas clients.
15KV-13.2KV transformer substation framework was made of angle steel, square pipe, channel steel or others. Our 15KV-13.2KV transformer substation framework has features as follow:
Custom designed to meet your dimensional requirements
Certified drawings & calculation package provided
Galvanized to ASTM A123
Design codes and specifications:
Industry: NESC, IEEE standard 605, and ASCE Manual 113
Wind: Per 2009 IBC & ASCE/SEI7-05
Seismic: Per 2006 IBC section 1613, ASCE 7-05 section 15.1.3 &12.8
Welding: ANSI/AWS D1.1-06
In material, we adopt high strength steel such as ASTM A572 GR50, GR65, Q420, Q460, S355J0, S355J0, Fe510, ST52 or other equivalent steel to meet project requirements. MEGATRO can optimize design and make 15KV-13.2KV transformer substation framework by solid, high strength, proper span distance, good wind resistance material, and economy in the use of materials.
After fabrication all 15KV-13.2KV transformer substation framework, are delivered to the galvanizing facility to be Hot DIP Galvanized. 15KV-13.2KV transformer substation framework is processed through the facility by Caustic Cleaning, Pickling, and then Fluxing. These strict procedures insure years of maintenance free structures.

Fabrication: Conform to clients' drawings and technical requirements
Place of Origin: Qingdao, Shandong, China.
Availability size: Based on the customer's requirements.
Material: Chinese material or as per clients' requirements
Package: Both party discusses and agreed before delivery
Terms of Payment: L/C; T/T
Minimum Order Quantity: 1 set
Port of Loading: Qingdao Port
Lead Time: One month or based on the customer's needs.

Performance Standard
Besides conform to the drawing and design, the materials and fabrication of tower components shall conform to Chinese Standards or international standard.
Send your message to this supplier
Avatar
Mr. Karl
Sales Director
*From:
To: Mr. Karl
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now